Much work being done on the outside AND the inside of FAITH house. Replaced 9 windows and trimmed them both inside and outside. Repaired a bunch of siding at the bottom of the walls. Prepped for painting at a later date.
Tuesday, August 17, 2010
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment