The sign at the entryway to the camp. This is a LARGE camp.. can handle about 600 people at one time.. it has 3 campuses right close to each other.. walking distance, in fact... elevation ~9200 ft. in a lovely setting..
This is the team that did the work. The ladies did an enormous amount of curtain making/ re-making, while the guys did the construction work.. A GREAT TEAM!!!
The finished roof extension. Will keep a lot of the snow off the steps that will be built right under this over hang. We extended the roof line by 24 inches.
The finished project. An extended roof over the steps, a new set of STURDY steps and a new roof over the entry way. A GREAT PROJECT, ready to handle the heavy snows in the winter.