Removing the siding, in preparation for removing the old, ugly insulation boarding which is now outlawed due to its flammability. Tough stuff to deal with..
The siding has been removed in preparation for framing for the installation of the A/C in the wall, AND for cutting the hole in the wall, to allow the A/C to sit in the wall and not in the window.
This is a statue, at the entrance to the Boys Ranch, which is of the man who started this camp and donated the land. It consists of 400+ acres of beautiful wooded land right on Lake
This is the shop building for the campus where we do a lot of our preping of materials for the on-site job.. It also houses a lot of materials we use on the projects..
This greenhouse got a lot of our attention, preparing it for the plastic cover that will be installed this fall, when the weather starts to get cold. It will be very valuable for different types of therapy for the boys, this winter..
This is the trailer where we did a lot of work laying tile and re-plumbing the whole trailer. See next pic....
Another task was to lay ceramic tile in 2 bedrooms, a bathroom, and a hallway of the trailer which will be used for housing of VIMers and staff. A huge amount of plumbing had to be done, as well. A HOT/ DIRTY JOB...
Another one of our tasks was to fix these doors on this shed. They were in pretty bad shape. It took a lot of work to get them so that they would open and close easily..