Wednesday, December 15, 2010

VIM REUNION 2011 SEP 8 - 11

YES, THERE WILL BE A VIM REUNION THIS
YEAR, 2011. THE DATES ARE THURS.,
SEP. 8 - SUN. SEP. 11.
Many details to follow, BUT, it now appears that
we will be parking at Hillsboro point this time, due to
renovation/ upgrading at the one we used before.

KS, NEWTON, ASBURY PARK UMC RETIREMENT CENTER

KANSAS, NEWTON, ASBURY PARK UMC RETIREMENT CENTER RV/non-RV
Dates: Jan. 17 – 21, 2011 AND Jan. 31 – Feb 4, 2011 RV Max: 6 Cost: $75/person
Team Leader: Jim/Eileen Dolbee (316)778.1461, (316)259.5348 mob, edolbee@aol.com AND Terry Schneider (620)752.3515, (316)621.1028 mob, jcts@wheatstate.com
NOTICE THAT THE FIRST 2 DATES HAVE BEEN SET. MORE TO FOLLOW.
Short stay projects, drive to and from until the RV park is ready for use. Non-RVers facilities not available at this time. More info on this, soon. I will be putting information on my blog as well as sending frequent emails updating the plan.

The type of work to start with will be mudding/sanding / painting the patches of small holes in sheetrock, left when a contractor blew insulation in the outside walls of many of the cottages. The painting will consist of painting the entire walls due to the inability to match the paint color that is there.

THIS IS A NEW OPPORTUNITY AND A GREAT ONE, CLOSE TO HOME FOR MANY OF US and the need is certainly there.
Stay tuned and check my blog for further updates/ information in the near future, ok? But, put this opportunity in your plans starting soon.

Tuesday, December 7, 2010

TALLGRASS SPIRITUAL RETREAT CENTER VIM TEAM 2010

TWO of the RV's that were
on-site. This about the
first time that any RV's
have come there. BUT,
it won't be the last, for
sure..

TALLGRASS SPIRITUAL RETREAT CENTER VIM TEAM 2010

Getting a good start on the tree trimming, while waiting for other materials needed for the remainder of the projects..

TALLGRASS SPIRITUAL RETREAT CENTER VIM TEAM 2010


A huge amount of tree trimming had to be done along with all the other 'stuff', that we did.

TALLGRASS SPIRITUAL RETREAT CENTER VIM TEAM 2010

Contemplating what to do next... the progress on the window trim and the railing around the stairs is coming along just wonderfully. The baseboard had to have the same treatment on it. A LOT OF WORK, but worth it.

TALLGRASS SPIRITUAL RETREAT CENTER VIM TEAM 2010

Finishing the top of this
dresser, along with all
the sanding of the old
ugly dark brown finish
on the window frames
and hand rails.

TALLGRASS SPIRITUAL RETREAT CENTER VIM TEAM 2010


The painters did an enormous amount of work
in this upstairs. The new paint job sure does look
good, though..

TALLGRASS SPIRITUAL RETREAT CENTER VIM TEAM 2010

Installing lattice around the entire deck, installing hand rails on the steps and building railing for parts of the deck.

TALLGRASS SPIRITUAL RETREAT CENTER VIM TEAM 2010

Installing lattice work
around the deck, to try
and prevent animals from
getting under the deck.

TALLGRASS SPIRITUAL RETREAT CENTER VIM TEAM 2010


Starting the process of caulking the window trim, washing the windows and painting the trim.

TALLGRASS SPIRITUAL RETREAT CENTER VIM TEAM 2010


Washing windows AND painting the trim, AFTER the caulking was complete.

TALLGRASS SPIRITUAL RETREAT CENTER VIM TEAM 2010

We literally cut this tub
into 3 pieces with a
sawz-all and then lifted
it out of the hole. It was
a lot heavier than any
of us thought it would be.

TALLGRASS SPIRITUAL RETREAT CENTER VIM TEAM 2010


Replacing the decking to cover the hole left by the removal of the hot tub.

TALLGRASS SPIRITUAL RETREAT CENTER VIM TEAM 2010


This is what the NEW decking looked like after the removal of the hot tub..

TALLGRASS SPIRITUAL RETREAT CENTER VIM TEAM 2010

We had to expand the
opening in the deck for
the growth of the tree.


TALLGRASS SPIRITUAL RETREAT CENTER VIM TEAM 2010


To finish the job right, our own gardener is hard at work, tidying up the garden areas. Great job, Jan.

Tuesday, November 23, 2010

RVIM TEAMS TO ASBURY PARK, NEWTON, KS

Asbury Park was once called "Friendly Acres", a United Methodist Retirement Center located in Newton, KS, 200 SW 14th St. I visited there recently, and have decided that we should take teams there, starting in January 2011
TWO TEAMS HAVE NOW BEEN SCHEDULED. The dates are, Jan. 17-21, 2011 AND Jan. 31 - Feb. 4, 2011.
My plan is to schedule several times to go there, due to the nature of the work which we can do in the winter weather. I also plan that we'll probably drive back and forth since it's so close and it will be too cold for RV's, plus I don't know of facilities for non-RVers, at this point in time.

Stay tuned, ok??

I'M LOOKING FOR SOMEONE TO STEP UP TO LEAD THESE TEAMS, so if the Lord speaks to you about this, consider answering the call, ok???

Sunday, October 17, 2010

MORNING STAR RANCH VIM TEAM 2010


Work being done on one of the 3 decks we put new railings on and we put new decking on 2 of the 3 decks, as well as new step treads on 2 of them.

MORNING STAR RANCH VIM TEAM 2010

This is some of the siding
that we replaced on 6
cabins.

MORNING STAR RANCH VIM TEAM 2010


These are some of the beds for which the ladies made mattress covers... 24 in all..

MORNING STAR RANCH VIM TEAM 2010


Linda even made a cover for one of the Camp Dogs.. Pretty special, I would say!!

MORNING STAR RANCH VIM TEAM 2010


The ladies made mattress covers for 24 mattresses. Those sewing machines were really hummin'!!!!

MORNING STAR RANCH VIM TEAM 2010

Some of the bunk beds
we built.

MORNING STAR RANCH VIM TEAM 2010


Another picture of some of the bunkbeds we built.

MORNING STAR RANCH VIM TEAM 2010


One of the 6 cabins we worked on and removed the siding up 24 inches from the decking. It was badly rotted due to wicking of the moisture from the decks.

MORNING STAR RANCH VIM TEAM 2010

Here the ladies are painting the new siding we put on the 6 cabins. This siding was removed 24 inches up from the decking and replaced.

Wednesday, October 13, 2010

MULVANE HOUSE - FOSTERS - 2010


This is the Mulvane House where we did all the work that the following pic's will display..

MULVANE HOUSE - FOSTERS - 2010


Paul and Vickie Foster, the couple who live in this house.

MULVANE HOUSE - FOSTERS - 2010

Just getting a good start
on the sheetrock
hanging. Notice that the
insulation is already in
place.

MULVANE HOUSE - FOSTERS - 2010


Where in the world does this piece go??? These are sure funny angles we are dealing with..

MULVANE HOUSE - FOSTERS - 2010


Hanging sheetrock in this room was quite a challenge. BUT, the guys did an outstanding job with it.

MULVANE HOUSE - FOSTERS - 2010

Tricky corners all over
these rooms. A real
challenge to make it look
good..!!

MULVANE HOUSE - FOSTERS - 2010


Great progress being made on the upstairs bedroom and lounge area.

MULVANE HOUSE - FOSTERS - 2010


The upstairs room is getting close to being ready for primer AND then paint.

MULVANE HOUSE - FOSTERS - 2010

This is what it looked like in one of the first floor rooms, when we were getting about finished. I don't have pic's of the completely finished/ painted work, but I hear that it is beautiful... GREAT JOB, TEAM!!

LAKESIDE VIM TEAM 2010


THE TEAM WHO DID ALL THE WORK AT LAKESIDE, THIS YEAR.
A MUCH SMALL TEAM IN NUMBERS, BUT A MIGHTY TEAM IN SKILL LEVEL!!

LAKESIDE VIM TEAM 2010


THE ENTRYWAY TO THE OFFICE GOT A COMPLETE MAKE-OVER. THE WALL WAS OUT OF ALIGNMENT, THE DOOR LEAKED WATER WHEN THE WIND BLOWS, THE DOOR WOULD HARDLY SHUT... IT WAS A MESS!!!
BUT, WE FIXED IT!!!

LAKESIDE VIM TEAM 2010


THE LADIES DID AN ENORMOUS AMOUNT OF WORK ON CURTAINS, AGAIN.. SEEMS LIKE THIS IS AN ANNUAL EVENT!!!

LAKESIDE VIM TEAM 2010


STARTING TO WORK ON PREPARING THE
SUMMER CABINS FOR A NEW PAINT JOB, AND A LOT OF PATCH WORK ON THE WINDOWS, AS WELL AS GLAZING A LOT OF THE WINDOWS.

LAKESIDE VIM TEAM 2010

THE SUMMER CABINS
NEEDED A NEW PAINT
JOB. SO, HERE WE
ARE, DOING JUST
THAT!!!

LAKESIDE VIM TEAM 2010

THE POLE SHADES
NEEDED NEW ROLLED
ROOFING. THEY GOT
JUST THAT!!!

LAKESIDE VIM TEAM 2010


LOOK OUT !!! DOWN COMES THAT DEAD TREE....

LAKESIDE VIM TEAM 2010


TIME TO DRAG THE TREE AWAY, THAT HAD JUST BE 'FELLED'..

LAKESIDE VIM TEAM 2010

THIS IS "L" CABIN, WHERE WE DID A LOT
OF WORK, GETTING IT READY FOR ANOTHER SEASON, AND TO BE ABLE TO USE IT FOR STORAGE, ETC.

LAKESIDE VIM TEAM 2010

INSTALLING NEW
DOORS ON "L" CABIN.
WE DID A LOT OF WORK
ON "L" CABIN.

LAKESIDE VIM TEAM 2010


STARTING TO PAINT THE SHOWER STALLS IN BOTH THE EAST CANYON SHOWER HOUSE AND THE POOL SHOWER HOUSE.

LAKESIDE VIM TEAM 2010


FINISHING THE PAINTING OF THE SHOWER STALLS WITH NON-SLIP PAINT.

LAKESIDE VIM TEAM 2010

MOVING DOCUMENTS
FROM STORAGE TO "L"
CABIN.

LAKESIDE VIM TEAM 2010


THE BOOKSHELVES PRACTICALLY FINISHED. THESE WERE BUILT FOR THE MAIN LODGE, TO SIT BESIDE THE FIREPLACE.

LAKESIDE VIM TEAM 2010

THE BOOKSHELVES WHEN FINISHED. GREAT PROJECT!!!

Sunday, September 5, 2010

HORN CREEK CHURCH CAMP VIM TEAM 2010


The sign at the entryway to the camp. This is a LARGE camp.. can handle about 600 people at one time.. it has 3 campuses right close to each other.. walking distance, in fact... elevation ~9200 ft. in a lovely setting..

HORN CREEK CHURCH CAMP VIM TEAM 2010


THE LONELY GOAT LODGE.. This is where I stayed for the 2 weeks, AND this is where the ladies did all the curtain making.. a GREAT facility..